The $2.5 billion project involved the trebling of the iron ore handling capacity of FMG’s Anderson Point Port. Simulus Engineers worked within an integrated team and were responsible for the construction support, detailed engineering, design and drafting for the new T60 and T155 transfer tower and sample station areas. New structures included conveyors, transfer stations, sample stations and upgrades to existing sample conveyors. Simulus provided professional services in Structural, Mechanical and Civil engineering, as well as integrated 3D modelling to include electrical and instrumentation requirements. The project consisted of approx 430t of steel and 650m3 of concrete
UA-70882163-1