Simulus Engineers provided on site lead process engineering for construction completion verification, commissioning, debottlnecking and ramp up for the Mutanda copper/cobalt project.

The Mutanda project processes 2.5Mt/a ore to produce 200,000 t/a copper cathode and cobalt hydroxide production. The flowsheet includes crushing, dense media separation, acid milling, atmospheric tank leach, heap leach, CCD, clarification and SX-EW with on site acid production.

Mill Commissioning